Performance, cost, and risk
What are the performance, cost, and risk impacts of implementing this product?
- Performance: Improved fault tree analysis performance.
- Cost: No large costs required if fault trees are already used in decision-making, only those related to modifying and testing the new model.
- Risk: Models can still be large, so better performance may not necessarily come at higher speed.
Implementation requirements
What capabilities would a business/organization/institution need to have to implement this product?
- Processes: Preexisting monitoring and diagnostic decision processes to inform reliability analyses.
- Resources: Fault tree data, computational infrastructure, skilled reliability engineers, budget for tool implementation.
- Competences: Knowledge of fault trees analysis and model checking.
- Technologies: Binary decision diagram tools (e.g., Storm), probabilistic model checking software.
Related works
- Basgöze et al. (2022). BDDs Strike Back: Efficient Analysis of Static and Dynamic Fault Trees.
- Weik et al. (2022). DFT Modeling Approach for Operational Risk Assessment of Railway Infrastructure.
Contact information
For further inquiries regarding this product, feel free to get in touch with:
- Mariëlle Stoelinga, University of Twente. m [dot] i [dot] a [dot] stoelinga [at] utwente [dot] nl
- Matthias Volk, Eindhoven University of Technology. m [dot] volk [at] tue [dot] nl









